Integrated Outdoor Circular Main Cabinet
Integrated Outdoor Circular Main Cabinet
+
  • Integrated Outdoor Circular Main Cabinet
  • Integrated Outdoor Circular Main Cabinet

Integrated Outdoor Circular Main Cabinet


Product Specifications:

Overall Model Explanation

  • EZH-12 12kV Dry air High-purity nitrogen, an environmentally friendly gas-insulated switchgear (without …) SF₆ )
  • (V V PT) : Three-Unit Combination Cabinet = 2 Line-in/line-out unit for vacuum circuit breakers (V)+1 Line bus voltage transformer PT Measurement and Monitoring Unit
  • 630 : One-time busbar rated current 630A20 Rated short-time withstand current 20kA/4s
  • KE-7120-B : Colin Electric Standardized Centralized DTU Substation terminal, fully integrated with primary and secondary equipment, compliant with State Grid’s “three-remote” standard configuration.

 

 

Basic parameters of an environmentally friendly gas-insulated switchgear

Parameter Item

Technical indicators

Note Description

Rated system voltage

12 kV, three-phase 50 Hz/60 Hz

Compatible with 10 kV urban distribution networks

Rated busbar current

630A

Rated current of the two‑pole circuit breaker circuit

Rated short-circuit breaking current

20kA

Arc-quenching fault current of the vacuum circuit breaker itself

Short-time thermal stability current / time

20 kA / 4 s

Thermal stability of the main circuit

Peak dynamic stability current

50kA

Withstand short-circuit impact current

Power-frequency withstand voltage (phase-to-phase / phase-to-ground)

42 kV; isolation gap 48 kV

Standard value for type testing

Lightning impulse withstand voltage

75 kV; isolation gap 85 kV

Lightning Protection Insulation Level

Insulating medium

High-purity dry air / nitrogen

Zero greenhouse effect, green and environmentally friendly

Air tank working pressure (20°C)

0.02–0.04 MPa (slight positive pressure)

Operation under atmospheric pressure with sealing

Annual leakage rate of the gas tank

≤0.05%

Stainless steel laser-sealed welded cavity

Protection rating

Air box IP67, cabinet enclosure IP42

Waterproof, dustproof, and anti-condensation

Mechanical life

Circuit breaker ≥ 10,000 operations; disconnect switch ≥ 3,000 operations; earthing switch ≥ 2,000 operations.

Maintenance-free mechanical structure

Standard cabinet dimensions

Single cabinet: 600 (W) × 800 (D) × 2000 (H); three cabinets arranged side by side as an integrated unit.

Modular assembly

Standard primary element

2 vacuum circuit breakers + three-position isolating grounding switch, PT voltage transformer, high-voltage fuse, surge arrester, live‑display indicator, pressure gauge, explosion‑proof pressure relief device, and mechanical five‑protection interlocks.

The PT is responsible for busbar pressure tapping, insulation monitoring, and secondary power supply.

 

KE-7120-B DTU Terminal Parameters

Parameter Category

Technical parameter value

Power supply

AC 220 V; backup DC 24 V / DC 48 V lithium battery

Total system power consumption

≤45VA

Measurement accuracy

Current ≤ ±0.2%, Voltage ≤ ±0.2%, Power ≤ ±1.0%

Collection capability

Connects to two circuit breakers for remote signaling, remote measurement, and remote control, and acquires PT zero-sequence voltage and busbar voltage.

Communication Protocol

IEC 101, IEC 104, Modbus; supports Ethernet, serial port, and 5G communication.

Time synchronization method

GPS time synchronization, SNTP network time synchronization

Core Features

Three‑remote functions (telemetry, telecontrol, and remote signaling), interphase short‑circuit and single‑phase ground fault detection, fault location and isolation, line loss accounting, event waveform recording, and local/remote control switching.

Work environment

-40℃ to +85℃, industrial-grade EMC protection

Mean Time Between Failures

≥50000h

 

Application scenarios:

  1. Urban municipal switchgear stations and cable ring network nodes   Dual circuit breakers enable bidirectional power supply in a ring network. PT Complete busbar voltage monitoring, DTU Upload data to the distribution network master station to enable rapid isolation of line faults and restoration of power to non-faulted sections.
  2. Industrial and commercial parks, factory premises 10kV Distribution Room   The two incoming feeders serve as backups for each other, PT It provides metering and protection voltage signals, features integrated primary–secondary functionality, eliminates on-site secondary wiring installation, and shortens the commissioning cycle of the distribution room.
  3. Critical loads such as data centers, hospitals, and large commercial complexes   Relying on circuit breakers to quickly clear short-circuit faults, DTU Remote monitoring of operating status enhances power supply continuity; environmentally friendly gas-free. SF₆ Asphyxiation risk; suitable for the enclosed environment of indoor switchgear rooms.
  4. Underground utility tunnels, tunnels, and electrical distribution facilities for underground parking garages   The fully sealed gas-insulated switchgear is resistant to moisture, water accumulation, and dust contamination. Its integrated, packaged design occupies a small footprint, making it well-suited for compact underground distribution spaces.
  5. Switching stations supporting distributed photovoltaic and wind power projects   It monitors and aggregates line voltage and current, detects photovoltaic grid‑connection faults, and collaborates with the master station to implement grid‑connection protection and feeder automation control.
  6. Old Distribution Network Intelligent Upgrade Project   The factory has completed the primary and secondary integrated assembly and commissioning, leaving only a single cable connection and communication interface on site, thereby significantly reducing the on-site installation and commissioning workload.

 

 

Product Advantages:

Single-cabinet design: environmentally friendly + highly reliable and maintenance-free

  1. None SF₆ Environmental Protection Plan : Use dry air / Nitrogen insulation, zero greenhouse gas emissions, compliance with dual-carbon goals and grid‑level environmental procurement requirements, and no need for gas recovery or treatment upon equipment decommissioning.
  2. Fully sealed stainless steel air tank : All live components are fully sealed within the enclosure, effectively isolating them from moisture, salt spray, small animals, and condensation, ensuring stable long-term operation in harsh environments; laser-welded gas chamber 30 Annual free gas-replenishment maintenance.
  3. Comprehensive Security Protection : Standard equipment includes a mechanical five‑point interlock to prevent misoperation, and a built-in directional pressure‑relief channel that directs the release of internal arc faults, ensuring the cabinet will not rupture.
  4. Compact modular structure V+V+PT The three-unit integrated arrangement occupies less floor space and reduces civil engineering costs compared to a split-type switchgear cabinet.

4.2 KE-7120-B DTU: Standardized Intelligent Integration, Compatible with State Grid Specifications

  1. OEM-matched integrated design : A current transformer and DTU Factory‑calibrated integration resolves on-site mismatches between primary and secondary parameters and untidy wiring, clarifies responsibility boundaries, and facilitates operation, maintenance, and troubleshooting.
  2. Advanced Feeder Automation FA Ability : Accurately detects phase-to-phase short circuits and high‑impedance ground faults, achieves fault isolation within hundreds of milliseconds, rapidly restores power to non‑faulted areas, and minimizes the scope of outages.
  3. Multi-mode communication networking : Supports fiber optic, wireless, 5G Slice-based transmission, with low-latency data upload and scheduling at the master station, supports both local manual and remote telecontrol modes.
  4. High-Stability Industrial Hardware : Full-loop electrical isolation, high strength EMC Anti-interference, wide-temperature operation, and suitable for long-term, uninterrupted use inside indoor and outdoor enclosures.

4.3 Comprehensive Integrated System Advantages

  1. Factory‑ready as a complete set, ready to install and use. : One switch, PT DTU All secondary wiring is assembled, commissioned, and tested to acceptance standards at the factory before leaving the premises, thereby reducing on-site installation work. 70% That’s all—delivery is fast.
  2. Unified Operations and Maintenance Management : All primary equipment status, gas pressure data, switch positions, and electrical quantity data are aggregated to DTU Centralized uploading enables operations and maintenance personnel to interface with a single intelligent system, ensuring standardized management.
  3. Lower total lifecycle cost : Maintenance-free once + Secondary intelligent centralized monitoring reduces the frequency of manual inspections and outage‑related maintenance, resulting in a substantial decrease in overall operations and maintenance costs.

 

Keywords: Integrated Outdoor Circular Main Cabinet

Previous page

Next page

If you have further needs, feel free to leave a message—we’ll reply to you as soon as we receive your message!

Send now